| Friday 4th August 2006 Todays panorama photograph of the site shows the progress of the pile driving. The picture shows the pile driving rig surrounded by recently driven concrete piles. On the far left of the photograph you can just make out where the hardcore has been removed and the piles have been cut to length (see photo below). |
![]() |
![]() |
Friday 28th August 2006 The last pile was driven on the 14th August as scheduled and the pile driving rig left site on the 15th August. The photograph below shows the site as the contractors dig out around the tops of the piles and prepare for the foundations. |
![]() |
Friday 15th September 2006 The
latest panorama photograph shows the site on a sunny afternoon.
|
|